The activities of this group are studies and research in the field of energy systems, analysis, conservation, renewable energy utilization energy audits, Environmental Impact Assessment. (EIA).
The industrial engineering application includes preventive maintenance system implementation, industrial systems analysis.
-
The assessment Bio-masse based electricity and heat generation in Egypt and Morocco for development of remote areas and job creation.
| Contractor |
Mansoura University / European Union Contract No CT94 AV 100006 |
| Nature |
Associate sub contractor. |
| Beginning of activity |
1995 |
| Activity terminated |
Feb. 1997 |
Brief description of the activity:
The development of rural areas is connected with the availability of energy resources. The remote area suffers from the insufficiencies of energy resources. The expansion of electrical grid is usually requires heavy investments. The decentralized generation systems are proved to be an efficient system. The task allocated to IC is the evaluation of bio-masse potential, then the selection of sit for the implementation of pilot units, socio-economical evaluation of the selected sites will be included.
- Solar Desalination for Development of Mediterranean Countries
| Contractor |
Mediterranean Solar Council, MSC, UNESCO Wold Solar Summit Process. |
| Nature |
sub contractor to the Spanish Catalonian Institute of energy. |
| Beginning of activity |
September 1995 |
Brief description of the activity:
The development of remote and isolated areas is a must for the development of the global economy of the southern Mediterranean countries. The renewable energy presents a promising supply of energy, available in every place, does not represent any threat to the environment. The sustainable development passes by the water resources insufficiency, solar desalination represent a promising avenue. The solar potential in the southern Mediterranean countries is considered high, despite that these technologies are not widely used commercially, the pilot plants gave a reasonable acceptable result. The objective of this study is to evaluate the need and proposing a complete proposal for the development and the utilization of these technologies through a tide cooperation between the Mediterranean countries.
- SOLAR Desalination for Development of Arab Countries
| Contractor |
Arab association of atomic energy, (Arab league) UNESCO World Solar Summit Process activity. |
| Nature |
direct contract |
Brief description of the activity:
The development of remote and isolated areas is a must for the development of the global economy of the Arab countries. The utilization of renewable energy preserves the environment. The sustainable development passes by the renewable energy utilization.
Most of the Arab countries suffer from the insufficiency of water resources. In order to respond to these problems of water resources insufficiency, solar desalination represent a promising avenue.
The objective of this study is to evaluate the need and proposing a complete proposal for the development of the utilization of these theologies.
- Mediterranean Cooperation for Water Desalination Policies in the Perspective of a Sustainable Development (MED-CO-DESAL).
| Contractor |
Mansoura University/ European commissions No (+30-1-7723218, 7723155) |
| Beginning of activity |
October 1997 |
| End of activity |
October 2000 |
Brief Description of the activity:
Water shortage problems are the main problem in Middle East countries. Egypt suffers from this crucial problem.
A careful resource assessment is required in order to help the decision-maker taking the appropriate decision.
The task of IC as sub contractor is in order to made the following duties
| 1. Water resource assessment for Egypt |
| 2. Assessment of the market potential |
| 3. Technology assessment |
Tasks one and two have been terminated the water supply and demand for Egypt has been evaluated. Geographic Information System was used (GIS) all the collected data were introduced to the GIS
- Environmental Impact Assessment (EIA) of lead melter Company
Assessment of lead smelter
| Nature |
associate to chemunics Egypt |
| Beginning of activity |
August 1997 |
| End of activity |
November 1997 |
Brief description of the activity
The activity of the preparation of the environmental impact assessment of the largest lead smelter in Egypt
In order to be approved by the national environmental protection Agency.
The role of IC was:
The technology evaluation and description
- Electrical work consultants for Hgr El-Nawatyia Railway bridge (Alexandria)
| Contractor |
HG/IC /9907 contract with Port Said company for Engineering Works |
| Beginning of activity |
August 1999 |
Brief description of the activity:
The activity consists of the preparation of wiring diagram, cable routing, and connections, control panel, Motors inspection and commissioning according to the standard
- Development of Small and medium industries in the southern Mediterranean Basin. EUMEDIS
Bebinning of Activity February 2002 ( three years contract)